Printer
Friendly Version |
 |
Lifting a Heritage Building
Vancouver, BC, Canada
Heritage Building being lifted by 28 Orbit Jacks (ORDH 60/6) |
|
 |
|
 |
 |
The 28 custom built ORBIT ORDH 60/6 Aluminum Cylinders were placed in strategic positions (there are 2 jacks at each post) both outside the building (seen here) as well as inside the building (not shown).
|
Each ORBIT jack had to remain outside for up to a week, however since they are all aluminum construction, there was no chance of corrosion. |
|